|
|
GOSHA

-
Located only 25 km northwest of the Gedabek development property.
-
Resource C2+P1 2.75 M t at 4.70 g/t Au and 6.33 g/t Ag with 416,000 oz of contained gold.
-
Confirmation sampling 0.62 to 23.24 g/t Au.
-
Low cash cost of production expected to be less than $90 per oz.
-
Technology/metallurgical tests indicate excellent recovery with cyanide.
-
Five main N-S veins are regularly spaced about 60 m apart, four additional perpendicular main E-W vein are regularly spaced at 10 to 50 m apart.
-
Some of the best grades were encountered in the lower level adits, the potential for ore shoots to project at depth is excellent .
- Ongoing refurbishment of adits will allow resampling in a timely manner, five levels of adits at 40m apart.

|
|